Traffic management for utilities, contractors, councils and events in Watford, Hertfordshire (WD17, WD18). Kit delivered for your team, or designed, installed and maintained by ours. 24/7 emergency callout.
Working on the road in Watford
Hertfordshire County Council is the highway authority for Watford: in two-tier Hertfordshire, roads are run by the county council, not Watford. Trunk roads are managed by National Highways.
Almost every English highway authority now runs a permit scheme under the Traffic Management Act 2004, so works on the road need a permit, applied for through the government's Street Manager service. Minor works usually need 3 working days' notice, standard works 10 and major works 3 months.
In and around Watford, the A41, A405 and A4008 carry most of the through traffic. The M1 and M25 are within a few miles. Work on or next to these roads usually needs signals or a lane closure rather than simple cones, and often off-peak or night working.
With around 90,000 people living in the town, footways, bus routes and school runs all shape how works here are planned.
Starting soon in Watford? The works planner works out your permit apply-by date and kit list in a minute.
Plan my worksServices
Everything from a single set of temporary traffic lights to a full road closure with a signed diversion, installed by our crews or hired for your team.
Installed, timed and maintained portable signals, from 2-way to full junctions.
Trained operatives controlling traffic by hand when signals won't do.
Tapers, advance signing and protection for work on busier and faster roads.
Full closures with signed diversion routes and the paperwork behind them.
Safe, accessible routes for people on foot when the footway is closed.
Parking, closures and crowd routes for events of every size.
Drawings, method statements and the street works applications behind them.
Burst main, collapse or crash: signs, lights and a crew, day or night.
Equipment hire
Delivered to your site in Watford for your trained team to install, or set out and maintained by ours.
Portable traffic lights
The workhorse for single-lane shuttle working on two-way roads.
Signs & boards
Manual control for short jobs, plant movements and convoy working.
Barriers
Red and white interlocking barriers for carriageway works.
Pedestrian & access
Temporary footways that take people safely into the road.
Questions
Hertfordshire County Council. In Watford, in two-tier Hertfordshire, roads are run by the county council, not Watford. Trunk roads are the responsibility of National Highways. We can make the application for you.
Yes. Portable traffic signals on a public road in Watford need the agreement of Hertfordshire County Council, normally requested with your permit. Private land such as car parks and sites doesn't need it.
Under the English permit schemes it's usually 3 working days for minor works, 10 for standard works and 3 months for major works or anything needing a road closure order. Use our works planner to get the exact apply-by date for your start date.
Yes. Our emergency line 01632 960 999 is answered 24/7. Crews cover Watford and nearby Bushey, Rickmansworth and Hatch End with signals, barriers and signs to make the site safe.