Skip to content
24/7:01632 960 999
Mr Traffic, Keeping Britain Moving

Tower Hamlets · England

Traffic management in Stepney

Traffic management for utilities, contractors, councils and events in Stepney, Tower Hamlets (E1). Kit delivered for your team, or designed, installed and maintained by ours. 24/7 emergency callout.

Working on the road in Stepney

Permits and rules in Stepney

Tower Hamlets Council is the highway authority for Stepney: the borough runs local roads, while Transport for London runs the red routes. Red routes, the main roads on the Transport for London Road Network, need TfL's agreement instead. Trunk roads are managed by National Highways.

Almost every English highway authority now runs a permit scheme under the Traffic Management Act 2004, so works on the road need a permit, applied for through the government's Street Manager service. Minor works usually need 3 working days' notice, standard works 10 and major works 3 months.

In and around Stepney, the A1, A2, A3, A10, A11 and A12 carry most of the through traffic. Work on or next to these roads usually needs signals or a lane closure rather than simple cones, and often off-peak or night working.

Around 16,000 people live in Stepney. On busier streets, keeping footways open and queues short matters as much as the works themselves.

Starting soon in Stepney? The works planner works out your permit apply-by date and kit list in a minute.

Plan my works

Equipment hire

Temporary traffic lights and barrier hire in Stepney

Delivered to your site in Stepney for your trained team to install, or set out and maintained by ours.

Signs & boards

Stop/Go boards

Manual control for short jobs, plant movements and convoy working.

Hire only or installed
Popular

Barriers

Chapter 8 barriers

Red and white interlocking barriers for carriageway works.

Hire only or installed

Pedestrian & access

Pedestrian walkways

Temporary footways that take people safely into the road.

Hire only or installed
  • Same-day quotes
  • Signal timings set for the site
  • Permits and TM drawings handled

Questions

Road works in Stepney: FAQs

Who do I apply to for a road works permit in Stepney?+

Tower Hamlets Council. In Stepney, the borough runs local roads, while Transport for London runs the red routes. Trunk roads are the responsibility of National Highways. We can make the application for you.

Do I need permission for temporary traffic lights in Stepney?+

Yes. Portable traffic signals on a public road in Stepney need the agreement of Tower Hamlets Council, normally requested with your permit. Private land such as car parks and sites doesn't need it.

How much notice do I need for road works in Stepney?+

Under the English permit schemes it's usually 3 working days for minor works, 10 for standard works and 3 months for major works or anything needing a road closure order. Use our works planner to get the exact apply-by date for your start date.

Can you cover an emergency in Stepney out of hours?+

Yes. Our emergency line 01632 960 999 is answered 24/7. Crews cover Stepney and nearby Shadwell, Limehouse and Wapping with signals, barriers and signs to make the site safe.

Nearby

Near Stepney

All towns in Tower Hamlets →

Working in Stepney?

Tell us the street and the dates. We'll come back with kit, crew, permits and a price for Stepney, usually the same day.

Call usPlan worksGet a quote