Skip to content
24/7:01632 960 999
Mr Traffic, Keeping Britain Moving

Kent · England

Traffic management in Southborough

Traffic management for utilities, contractors, councils and events in Southborough, Kent (TN4). Kit delivered for your team, or designed, installed and maintained by ours. 24/7 emergency callout.

Working on the road in Southborough

Permits and rules in Southborough

Kent County Council is the highway authority for Southborough: in two-tier Kent, roads are run by the county council, not Tunbridge Wells. Trunk roads are managed by National Highways.

Almost every English highway authority now runs a permit scheme under the Traffic Management Act 2004, so works on the road need a permit, applied for through the government's Street Manager service. Minor works usually need 3 working days' notice, standard works 10 and major works 3 months.

Primary routes through Southborough include the A21, A26 and A2014. On roads like these, queue lengths decide the method: we set signal timings to keep traffic moving and suggest night or off-peak work where it helps.

Southborough is home to around 12,000 people, so works plans need to think about pedestrians, buses and deliveries as well as through traffic.

Starting soon in Southborough? The works planner works out your permit apply-by date and kit list in a minute.

Plan my works

Equipment hire

Temporary traffic lights and barrier hire in Southborough

Delivered to your site in Southborough for your trained team to install, or set out and maintained by ours.

Signs & boards

Stop/Go boards

Manual control for short jobs, plant movements and convoy working.

Hire only or installed
Popular

Barriers

Chapter 8 barriers

Red and white interlocking barriers for carriageway works.

Hire only or installed

Pedestrian & access

Pedestrian walkways

Temporary footways that take people safely into the road.

Hire only or installed
  • Same-day quotes
  • Signal timings set for the site
  • Permits and TM drawings handled

Questions

Road works in Southborough: FAQs

Who do I apply to for a road works permit in Southborough?+

Kent County Council. In Southborough, in two-tier Kent, roads are run by the county council, not Tunbridge Wells. Trunk roads are the responsibility of National Highways. We can make the application for you.

Do I need permission for temporary traffic lights in Southborough?+

Yes. Portable traffic signals on a public road in Southborough need the agreement of Kent County Council, normally requested with your permit. Private land such as car parks and sites doesn't need it.

How much notice do I need for road works in Southborough?+

Under the English permit schemes it's usually 3 working days for minor works, 10 for standard works and 3 months for major works or anything needing a road closure order. Use our works planner to get the exact apply-by date for your start date.

Can you cover an emergency in Southborough out of hours?+

Yes. Our emergency line 01632 960 999 is answered 24/7. Crews cover Southborough and nearby Royal Tunbridge Wells, Tonbridge and Paddock Wood with signals, barriers and signs to make the site safe.

Nearby

Near Southborough

All towns in Kent →

Working in Southborough?

Tell us the street and the dates. We'll come back with kit, crew, permits and a price for Southborough, usually the same day.

Call usPlan worksGet a quote