Traffic management in Horwich

Traffic management for utilities, contractors, councils and events in Horwich, Bolton (BL6). Kit delivered for your team, or designed, installed and maintained by ours. 24/7 emergency callout.

Working on the road in Horwich

Permits and rules in Horwich

Bolton Council is the highway authority for Horwich: Bolton is the highway authority for local roads. Trunk roads are managed by National Highways.

Almost every English highway authority now runs a permit scheme under the Traffic Management Act 2004, so works on the road need a permit, applied for through the government's Street Manager service. Minor works usually need 3 working days' notice, standard works 10 and major works 3 months.

In and around Horwich, the A58, A673 and A6027 carry most of the through traffic. The M61 is within a few miles. Work on or next to these roads usually needs signals or a lane closure rather than simple cones, and often off-peak or night working.

With around 21,000 people living in the town, footways, bus routes and school runs all shape how works here are planned.

Starting soon in Horwich? The works planner works out your permit apply-by date and kit list in a minute.

Plan my works

Equipment hire

Temporary traffic lights and barrier hire in Horwich

Delivered to your site in Horwich for your trained team to install, or set out and maintained by ours.

Signs & boards

Stop/Go boards

Manual control for short jobs, plant movements and convoy working.

Hire only or installed
Popular

Barriers

Chapter 8 barriers

Red and white interlocking barriers for carriageway works.

Hire only or installed

Pedestrian & access

Pedestrian walkways

Temporary footways that take people safely into the road.

Hire only or installed
  • Same-day quotes
  • Signal timings set for the site
  • Permits and TM drawings handled

Questions

Road works in Horwich: FAQs

Who do I apply to for a road works permit in Horwich?+

Bolton Council. In Horwich, Bolton is the highway authority for local roads. Trunk roads are the responsibility of National Highways. We can make the application for you.

Do I need permission for temporary traffic lights in Horwich?+

Yes. Portable traffic signals on a public road in Horwich need the agreement of Bolton Council, normally requested with your permit. Private land such as car parks and sites doesn't need it.

How much notice do I need for road works in Horwich?+

Under the English permit schemes it's usually 3 working days for minor works, 10 for standard works and 3 months for major works or anything needing a road closure order. Use our works planner to get the exact apply-by date for your start date.

Can you cover an emergency in Horwich out of hours?+

Yes. Our emergency line 01632 960 999 is answered 24/7. Crews cover Horwich and nearby Blackrod, Adlington and Westhoughton with signals, barriers and signs to make the site safe.