Skip to content
24/7:01632 960 999
Mr Traffic, Keeping Britain Moving

Haringey · England

Traffic management in Harringay

Traffic management for utilities, contractors, councils and events in Harringay, Haringey (N4, N15, N8). Kit delivered for your team, or designed, installed and maintained by ours. 24/7 emergency callout.

Working on the road in Harringay

Permits and rules in Harringay

Haringey Council is the highway authority for Harringay: the borough runs local roads, while Transport for London runs the red routes. Red routes, the main roads on the Transport for London Road Network, need TfL's agreement instead. Trunk roads are managed by National Highways.

Almost every English highway authority now runs a permit scheme under the Traffic Management Act 2004, so works on the road need a permit, applied for through the government's Street Manager service. Minor works usually need 3 working days' notice, standard works 10 and major works 3 months.

The A1, A10, A102, A104, A107 and A406 pass through or close to Harringay. Work on or next to these roads usually needs signals or a lane closure rather than simple cones, and often off-peak or night working.

Harringay is home to around 23,000 people, so works plans need to think about pedestrians, buses and deliveries as well as through traffic.

Starting soon in Harringay? The works planner works out your permit apply-by date and kit list in a minute.

Plan my works

Equipment hire

Temporary traffic lights and barrier hire in Harringay

Delivered to your site in Harringay for your trained team to install, or set out and maintained by ours.

Signs & boards

Stop/Go boards

Manual control for short jobs, plant movements and convoy working.

Hire only or installed
Popular

Barriers

Chapter 8 barriers

Red and white interlocking barriers for carriageway works.

Hire only or installed

Pedestrian & access

Pedestrian walkways

Temporary footways that take people safely into the road.

Hire only or installed
  • Same-day quotes
  • Signal timings set for the site
  • Permits and TM drawings handled

Questions

Road works in Harringay: FAQs

Who do I apply to for a road works permit in Harringay?+

Haringey Council. In Harringay, the borough runs local roads, while Transport for London runs the red routes. Trunk roads are the responsibility of National Highways. We can make the application for you.

Do I need permission for temporary traffic lights in Harringay?+

Yes. Portable traffic signals on a public road in Harringay need the agreement of Haringey Council, normally requested with your permit. Private land such as car parks and sites doesn't need it.

How much notice do I need for road works in Harringay?+

Under the English permit schemes it's usually 3 working days for minor works, 10 for standard works and 3 months for major works or anything needing a road closure order. Use our works planner to get the exact apply-by date for your start date.

Can you cover an emergency in Harringay out of hours?+

Yes. Our emergency line 01632 960 999 is answered 24/7. Crews cover Harringay and nearby West Green, Stroud Green and Hornsey with signals, barriers and signs to make the site safe.

Nearby

Near Harringay

All towns in Haringey →

Working in Harringay?

Tell us the street and the dates. We'll come back with kit, crew, permits and a price for Harringay, usually the same day.

Call usPlan worksGet a quote