Portable traffic lights
2-way portable traffic lights
The workhorse for single-lane shuttle working on two-way roads.
Barnet · England
Need to work on a road in East Finchley? We supply and install portable traffic lights, signs, barriers and closures across Barnet (N2), and handle the paperwork with Barnet Council.
Working on the road in East Finchley
Barnet Council is the highway authority for East Finchley: the borough runs local roads, while Transport for London runs the red routes. Red routes, the main roads on the Transport for London Road Network, need TfL's agreement instead. Trunk roads are managed by National Highways.
Almost every English highway authority now runs a permit scheme under the Traffic Management Act 2004, so works on the road need a permit, applied for through the government's Street Manager service. Minor works usually need 3 working days' notice, standard works 10 and major works 3 months.
In and around East Finchley, the A1, A41, A406, A598 and A1100 carry most of the through traffic. The M1 is within a few miles. Work on or next to these roads usually needs signals or a lane closure rather than simple cones, and often off-peak or night working.
East Finchley is home to around 16,000 people, so works plans need to think about pedestrians, buses and deliveries as well as through traffic.
Starting soon in East Finchley? The works planner works out your permit apply-by date and kit list in a minute.
Plan my worksServices
Everything from a single set of temporary traffic lights to a full road closure with a signed diversion, installed by our crews or hired for your team.
Installed, timed and maintained portable signals, from 2-way to full junctions.
Trained operatives controlling traffic by hand when signals won't do.
Tapers, advance signing and protection for work on busier and faster roads.
Full closures with signed diversion routes and the paperwork behind them.
Safe, accessible routes for people on foot when the footway is closed.
Parking, closures and crowd routes for events of every size.
Drawings, method statements and the street works applications behind them.
Burst main, collapse or crash: signs, lights and a crew, day or night.
Equipment hire
Delivered to your site in East Finchley for your trained team to install, or set out and maintained by ours.
Portable traffic lights
The workhorse for single-lane shuttle working on two-way roads.
Portable traffic lights
Multi-phase control for works at or near a T-junction.
Barriers
Accessible barriers with a tapping rail for the footway.
VMS & vehicles
Trailer-mounted LED signs to warn drivers days ahead.
Questions
Barnet Council. In East Finchley, the borough runs local roads, while Transport for London runs the red routes. Trunk roads are the responsibility of National Highways. We can make the application for you.
Yes. Portable traffic signals on a public road in East Finchley need the agreement of Barnet Council, normally requested with your permit. Private land such as car parks and sites doesn't need it.
Under the English permit schemes it's usually 3 working days for minor works, 10 for standard works and 3 months for major works or anything needing a road closure order. Use our works planner to get the exact apply-by date for your start date.
Yes. Our emergency line 01632 960 999 is answered 24/7. Crews cover East Finchley and nearby Finchley, Fortis Green and Church End with signals, barriers and signs to make the site safe.
Nearby
Tell us the street and the dates. We'll come back with kit, crew, permits and a price for East Finchley, usually the same day.